GLSV

63

By mikesun

Geosynchronous Satellite Launch Vehicle

Layout

The GSLV improved on the performance of the PSLV with the addition of liquid strap-on boosters and a cryogenic upper stage. It is a three-stage launch vehicle with the first stage being solid-propelled, the second liquid-propelled and the final stage being cryogenically propelled. The solid first and liquid second stages are carried over from the PSLV. Early GSLV launches used cryogenic upper stages supplied by Russia. India originally tried to buy the technology to build a cryogenic upper stage from Russia, but under pressure from the United States, that technology was not provided. Therefore, ISRO has been working on developing a cryogenic upper stage for the past eleven years.

The GSLV can place approximately 5000 kg (11,000 lbm) into an easterly low Earth orbit. Using the Russian 12KRB upper stage, with KVD-1 cryogenic rocket engine, GSLV can place 2200 kg (4,850 lbm) into an 18 degree geostationary transfer orbit.

Liquid boosters

The GSLV uses four L40 liquid strap-on boosters derived from the L37.5 second stage, which are loaded with 40 tons of hypergolic propellants (UDMH & N2O4). The propellants are stored in tandem in two independent tanks 2.1 m diameter. The engine is pump-fed and generates 680 kN of thrust.

First stage

S139 stage is 2.8 m in diameter and is made of M250 grade maraging steel and it has a nominal propellant loading of 139 t.

Second stage

The second stage is 2.8 m in diameter and is loaded with 37.5 t of liquid propellants (UDMH & N2O4) in two compartments of an aluminium alloy stage tankage separated by a common bulk head. This is powered by Vikas engine, which is a pump-fed engine of 720 kN thrust.

Third stage

The third stage is 2.8 m in diameter and uses liquid hydrogen (LH2) and liquid oxygen (LOX) in two separate tanks of aluminium alloy interconnected by an inter-stage. Propellant loading is 12.5 t. ISRO plans to use its own cryogenic engine from the fifth planned GSLV flight. On November 15, 2007 the indigenously developed "Cryogenic Upper Stage" was tested for 720 seconds, its full flight duration. The test was conducted at the Liquid Propulsion Systems Centre, ISRO's rocket engine test facility in Tamil Nadu. The testing qualified the flight stage for use on the next GSLV launch (GSLV-D3),scheduled to take place in 2008

.

GSLV

Geosynchronous Satellite Launch Vehicle Fact sheet

Function Expendable launch vehicle

Manufacturer

ISRO

Country of origin

India

Size

Height 49 m (160 ft) Diameter 2.8 m (9.1 ft) Mass 402,000 kg (886,000 lb) Stages 3 Capacity

Payload to LEO 5,000 kg (11,000 lb) Payload to

GTO 2,500 kg (5,500 lb) Launch History

Status Active Launch sites

Sriharikota

Total launches 5 Successes 3 Failures 1 Partial failures 1 Maiden flight

18 April

2001

Boosters (Stage 0)

No boosters 4 Engines 1 L40H Vikas 2 Thrust 680 kN

Total thrust 2,720 kN Specific impulse 262 sec Burn time 160 seconds Fuel

N2O4/UDMH

First Stage

Engines 1 S139

Thrust 4,700 kN

Specific impulse 166 sec Burn time 100 seconds Fuel

HTPB (solid) Second Stage

Engines 1 GS2 Vikas 4 Thrust 720 kN Specific impulse 295 sec Burn time 150 seconds Fuel

N2O4/UDMH

Third Stage

Engines 1 RD-56M

Thrust 73.5 kN Specific impulse 460 sec Burn time 720 seconds

Fuel

Variants

[edit] Operational

GSLV Mk.1 (a)

This variant had a 125 t (S-125) first stage and was capable of launching 1500kg into geostationary transfer orbit.

GSLV Mk.1 (b)

This variant had 139 t (S-139) first stage and improved fuel in the strap-on boosters & second stage. This variant can launch 1900kg into geostationary transfer orbit.

[edit] Under development

GSLV Mk.2

This variant uses a Indian cryogenic engine and is capable of launching 2500kg into geostationary transfer orbit.

[edit] Launches

The first two flights of the GSLV were developmental. The first, partially successful, flight was on 18 April 2001 which launched GSAT-1. The second, which was fully successful, was on 8 May 2003 launching the experimental communication satellite GSAT-2. The first operational flight (GSLV-F01) was the launch of the EDUSAT communications satellite on 20 September 2004.

The fourth flight (GSLV-F02) on 10 July 2006 was unsuccessful in launching the 2168 kg (4,780 lb) communications satellite INSAT-4C as both rocket and satellite had to be destroyed over the Bay of Bengal after the rocket's trajectory veered outside of permitted limits.[2] A defective propellant regulator of the fourth strap-on motor caused the INSAT-4C-carrying vehicle to crash a minute after lift-off from Sriharikota on the Andhra Pradesh coast on 10 July 2006.[3] The fifth flight of GSLV (GSLV-F04), carrying a replacement for INSAT-4C was successfully completed on 2 September 2007, carrying the INSAT-4CR satellite ( a payload of roughly 2160 kg carrying 12 KU band transponders capable of reaching across India) into Geosynchronous Transfer Orbit.[4]

The five flights of GSLV so far have used Russian cryogenic engine for the last stage. The next flight scheduled some time in 2008 will use an indigenous cryogenic engine developed by ISRO.

Launch log

Version Variant Date of Launch Launch Location Payload Mission Status D1 GSLV Mk.1 18 April 2001 Sriharikota GSAT-1 Success, Developmental Flight [5] D2 GSLV Mk.1(2) 8 May 2003 Sriharikota GSAT-2 Success, Developmental Flight [6] F01 GSLV Mk.1(2) 20 September 2004 Sriharikota EDUSAT Success, First operational flight [7] F02 GSLV Mk.1(2) 10 July 2006 Sriharikota INSAT-4C Unsuccessful; both rocket and satellite had to be destroyed over the Bay of Bengal after the rocket's trajectory veered outside of permitted limits. F04 GSLV Mk.1(2) 2 September 2007 Sriharikota INSAT-4CR Success, put 2160 kg of payload in Geo-stationary Transfer Orbit.[

REAL PAINTING

india gslv rocket
india gslv rocket
gslv 3
gslv 3

Comments

No comments yet.

Submit a Comment
Members and Guests

Sign in or sign up and post using a hubpages account.



    • No HTML is allowed in comments, but URLs will be hyperlinked
    • Comments are not for promoting your Hubs or other sites

    Please wait working